Very economical for long spans. Prefabricated segments provide more quality control. The structure can be fully loaded immediately after being pre-stressed. The pre-stressed cables can be inspected and replaced at all times
Keyskills: radiographic testing development financing bridge construction engineering engineering design services pressure vessels bridge financing mechanical engineering inspection engineering inspection